Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
04/05/2010

New Health And Leisure Complex For Praa Sands Holiday Park

The opening of a health and leisure complex at Praa Sands Holiday Park, designed and built by Pinelog, completes the owner’s commitment to provide residents and visitors with additional leisure facilities.

As a further investment in its holiday locations, residential and holiday park specialist, the Haulfryn Group decided to extend and refurbish the clubhouse at Praa Sands to include a health and leisure complex.

The directors were clear that it should be highly sustainable, creatively designed and meet the needs of its holiday home owners. Having considered the expectations and objectives for the building, they realised that the least expensive option, and the only one that would meet building regulations and future development plans, was to build a complete new complex.

Won in competition with other architects, the proposal from leisure building specialist - Pinelog was selected as it was highly competitive and the most exciting and adaptable design submitted. Pinelog and Haulfryn also have a history of very successful collaboration on similar projects at other holiday parks.

With Pinelog’s technical and regulatory assistance, the planning process ran smoothly and consent was obtained on this sensitive site. Exploiting the fact that it sits on an undulating site with open views, the new leisure facility comprises 1000 sq.m. of space, distributed over a single floor. The scheme is planned around two open spaces, an entertainment room/restaurant facing south to take advantage of views over the sea, and a swimming pool with children’s pool and spa.

-- Advertisement --
hss

The main structural component is the timber glulam frame manufactured from renewable sources and formed into exposed columns and roof beams. This highly insulated frame is topped by a 30 degree slate effect concrete tiled roof and clad externally with cedar panels and block and render. On the west face, a V-shaped gabled entrance projects forward from the building line. This is the main arrival point and has been designed to complement the main building, providing a welcoming environment for visitors and accommodating a possible future development – a conservatory.

The entrance leads to a lobby area with seating and an island reception desk which connects the functions of the building and allows staff to monitor the movement of users at all times. Leading directly off the reception area is the 150 sq.m entertainment room /restaurant. Its exposed timber frame and soaring double height ceiling combine to give a comfortable, airy feel. Double doors open directly onto a sun terrace where visitors can relax and take advantage of views over the sea.

This main function area is supported by a range of other rooms including a kitchen, bar, cellar, office, store rooms and toilet facilities. Along the internal wall of the entertainment room is a large window that overlooks the 14m x 6m constant depth swimming pool, a children's splash pool, spa pool, steam room and changing facilities. Also overlooking the pool is a gymnasium with the latest running, step and rowing machines.

Delivered on time and on budget, feedback from the client has been universally positive. With excellent thermal and acoustic qualities, natural light and ventilation, the extensive use of timber inside and out creates a warm ambience.

The structural form gives the building considerable height in the main spaces enabling it to have significant presence for a single storey building. The building is so well designed and built that when the air tightness test was carried out, an air permeability rate of 3.35m3 was achieved – three times less than that required under Building Regulation Part L2A/B.

(GK)

Latest Construction News

25/11/2024

Estilo Interiors has been selected to help Bruntwood SciTech as they invest a further £2.4 million into Birmingham as part of a plan to transform its Mclaren innovation hub. The project, located less than five minutes' walk from the future HS2 Curzon Street Station, will involve the building ...
25/11/2024

Cambridge Investment Partnership (CIP) has reached a significant milestone at Aylesborough Close in Arbury, with the completion of a topping-out ceremony. CIP board members, ward councillors, One Public Estate, Homes England and the CIP team gathered to lay the final brick at the highest point of ...
25/11/2024

Lovell has appointed Nicola Colley as head of land in the West Midlands, boosting the business' expertise in land opportunities. Having previously worked at Lovell for 12 years, Nicola has returned to a brand-new role at the national housebuilder, bringing with her experience from Taylor Wimpey ...
25/11/2024

Stepnell has commenced enabling works for a significant £9 million refurbishment of the Grade II listed Town Hall in Hugh Town, located on St Mary's in the Isles of Scilly. Spearheaded by the Council of the Isles of Scilly in partnership with Scilly Arts & Heritage, the project marks a pivotal ...
25/11/2024

Morgan Sindall Construction has successfully completed the restoration of West Bromwich Town Hall and Library, restoring the significant building to its former glory for the community to enjoy. Prior to the project's handover, Morgan Sindall gave a presentation to the SMBC Members and Town ...
25/11/2024

Persimmon Homes Severn Valley has donated 10,000 bricks to AccXel, the Construction Skills Accelerator Centre in Cinderford. The contribution will enable students at the Gloucestershire-based facility to gain hands-on experience and develop essential skills for the construction industry. The ...
25/11/2024

Nearly a year after work began, significant progress is being made at Huddersfield station as part of the Transpennine Route Upgrade (TRU). This transformative project aims to modernise the key northern transport hub while preserving its rich heritage as a Grade I listed building. One of the ...
25/11/2024

Renovating a property can be a challenging and complex process, especially when integrating new and existing building elements. At R Elliott Associates Ltd, we specialise in helping clients navigate these challenges by providing expert planning, design, and support to pre-empt any potential ...
25/11/2024

Northumbrian Water has announced a significant investment of £3.5 million at its Great Ayton Sewage Treatment Works (STW) to enhance its capacity to manage stormwater. The project involves the installation of a new storm tank capable of holding up to 317 cubic meters of combined rainwater and ...
25/11/2024

Balfour Beatty Flannery, a partnership between Balfour Beatty and Flannery Plant Hire, has trained its 1,000th student at its Operator Skills Hub. With over 250,000 additional workers needed in the construction industry by 2028, Balfour Beatty Flannery's Operator Skills Hub is key in addressing ...
Aqua Direct LtdT & D Glazing And Installation LimitedThink Construction Skills Ltd.Efco UK LtdStuart CanvasBRICOFLOR UKLakeside HireForge Lifts LtdAtlas Winch & Hoist Services Ltd (UK)Landscaping Cambridge
Terms and Conditions
2024/11/26 11:53:18