In December 2012, a team of British scientists and engineers will drill through 3km of solid ice into the buried Lake Ellsworth, Antarctica, to search for life forms in the water and clues to the past climate on earth buried in the lake bed sediments.
AIM has been helping the project in its own small, but important, way. Les Johnson (AIM’s Technical Director and resident insulation systems expert) has contributed to the project by designing an insulation system capable of protecting the stainless steel inlet pipe to the all-important hot water drill, down to continuous operating temperatures of as low as -25°C. This system incorporates elements provided by NMC UK, an insulation manufacturer based in Tredegar, South Wales who specialise in polyethylene foams, and combining this with a heat trace system manufactured by Pentair Thermal Management of Washington, Tyne and Wear.
The mission is the culmination of years of research into life in extreme environments.
If the team find life in the sub glacial lake, it will be significant as the lake’s water has been under incredible pressure and shut off from any light for up to half a million years, before the last Great Ice Age.
If the team are not successful in the search for life under lake Ellsworth it would be even more significant as it would reveal the limits at which life on earth can no longer exist. This in turn is of relevance as it would aid the search for life elsewhere on Earth, and on other planets.
So, why choose Lake Ellsworth? The first reason is that the lake itself is small, and therefore easy to understand. It is also isolated topographically and therefore resistant to ice sheet changes that occur over glacial cycles or ice flows that would disrupt the lake.
In terms of supply routes it makes a lot of sense to, as it is close to the logistical hub at Union Glacier from where heavy loads can arrive from South America and be transported to the site.
AIM will be following the progress of the mission closely. If you would like to know more about the mission you can visit their website at: www.ellsworth.org.uk
We will be bringing you a series of articles on the mission, we hope you will be as interested in the project as we all are at AIM.
www.insulationandlagging.co.uk
Time and date
CONSTRUCTION DIRECTORY
Construction News
02/11/2012
Advanced Insulation Manufacturing Ltd Lends Its Expertise To The Lake Ellsworth Project
Latest Construction News
29/11/2024
Helmsley Group secured planning permission for the final part of its Coney Street Riverside masterplan which will bring much needed residential space to the city and realise a 50-year ambition to reconnect York to its riverfront. With work expected to start in the summer of 2025, this approval ...
29/11/2024
Network Space Developments (NSD) has received planning approval from Manchester City Council for a major redevelopment project at its Welcomb Street site in Openshaw, Manchester. The four-acre site, acquired by NSD in 2022, will be transformed into an extension of the adjacent City Works Business ...
29/11/2024
Work has commenced on a new lighting scheme designed to create brighter streets in Digbeth, close to HS2's Birmingham Curzon Street station. The Birmingham City Council project – funded in part through a £210,140 investment from HS2's Business and Local Economy Fund (BLEF) – will see the ...
29/11/2024
Building work has commenced on 14 new modern one-bedroom apartments at Ludwick Green in Welwyn Garden City. The apartments are being developed as part of Welwyn Hatfield Borough Council's (WHBC) Affordable Housing Programme, and its commitment to building new social and affordable homes. Ludwick ...
29/11/2024
River Capital has invested £500,000 in Liverpool-based M&E engineering consultancy, Steven A Hunt & Associates Ltd. The funding was structured to facilitate a management buyout (MBO) by the senior management team of Neil Baines, Anne King, Dave Kelly and Dominic Sibbring from founder Steven Hunt, ...
29/11/2024
Henley Restoration and Remedials has been chosen to carry out extensive external and structural repairs on the Grade II-listed Phoenix Mill, the oldest building in the Rutland Mills complex. Originally a grain store, Phoenix Mill later became a corn mill in the 19th century before transitioning ...
29/11/2024
Dorset County Council's North East Technology Park (NETPark) has been allocated over £11 million towards its expansion. The North East Combined Authority's Cabinet has approved £11.3m of funding for the Sedgefield site from its £160m flagship North East Investment Zone (NEIZ), which aims to drive ...
29/11/2024
Laing O'Rourke, in collaboration with Barnsley College and T3 Training & Development, have opened the UK's first dedicated modern methods of construction (MMC) training facility. The first of its kind training centre represents a groundbreaking step in addressing the UK's construction skills ...
29/11/2024
Aqua Direct are keen to share their support for the Urgent Funding campaign from St Giles Hospice. With a national hospice funding crisis, they need your support more than ever ...
29/11/2024
As we approach the end of 2024, we have been reflecting on what an action-packed year it has been. We have worked with some fantastic clients and sites across the country. We started from our base in Essex over ten years ago, and the demand for trackway has certainly been at its highest ...