Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
12/12/2012

Invizifix® Thermo-Ash (FSC Hardwood)

Construction News Image
Ash hardwood would normally only be used for bespoke internal joinery projects, however, due to the Thermo process (Thermo-Ash) can now revolutionise the outdoor market bringing a high quality exclusivity to the discerning client who wants only the best.





Ecological

100% Natural

Free of Chemicals

Environmentally friendly and recyclable

Stability

Moisture content

Reduced Water absorption

Minimized Swelling, Bending & Splitting

Durability

25+years of Durability

Resins and sugars removed

Improved durability against fungus and insect attack

Highly durable against all weather conditions

Thermowood is a modification process with steam and high heat treatment. This process takes between 48 and 96 hours, taking into account some variables such as; timber species, width and initial moisture content.

Thermowood process can be divided into 3 stages; high temperature drying, heat treatment and cooling. Most of the negatives of wood are minimized and have been abolished.

As a result of the high temperature applied to the wood, the substances which shorten the lifecycle of any timber (glucose,citric acid, resin etc) which exist at the inner part of the wood are resolved and crystallized. This process makes the physical properties of the timber better, improves the durability and provides an excellent colour.

-- Advertisement --
hss

The reduced moisture content of the wood and relative humidity removed the Thermo-Ash, Thermo-Iroko and Thermo-Oak becomes very stable.

THERMOWOOD METHOD

1. Temperature increase and high temperature drying:

Wood temperature is raised rapidly using heat and steam to a level of around 100 deg C. Thereafter the temperature is increased steadily to 130 deg C and moisture content is reduced to almost zero.

2. Heat Treatment:

Whenever high heat drying is required the temperature is increased to a level of between 185 - 215 deg C. When the correct level is reached the temperature remains constant for 2-3 hours.

3. Cooling and Conditioning:

In this final stage, the temperature is reduced to 50-60 deg C by using a controlled water spraying system, this process continues until the moisture content reaches between 4% - 6%.

During this raising and lowering of the temperature, a special adjustment system is used in order to prevent the surface and inside from checking and spitting. These values differ depending on the species and dimensions.

Typical Uses

Because Ash is a tough timber it is used for sports equipment such as Oars, Bats and Cues. Handles for workshop tools and garden tools. Ash is also renowned for quality furniture, boatbuilding and paddles, interior joinery, built in kitchens and decorative veneers. Now thanks to the Thermo process, stable and durable exterior decking.

QTD's Unique Hidden INVIZIFIX® Profile

QTD's Exclusively designed edge profile virtually hides the fixing while still allowing you access to remove and replace a damaged or badly marked board.

Thus eliminating the need to cut out the offending board and face fix and plug the screw holes on a new one.

www.QualityTimberConstruction.co.uk

www.QualityTimberDecking.com

www.QualityTimberSupplies.com

Phone: 0118-932-8596

Mobile: 07801-887745

Latest Construction News

29/11/2024

Helmsley Group secured planning permission for the final part of its Coney Street Riverside masterplan which will bring much needed residential space to the city and realise a 50-year ambition to reconnect York to its riverfront. With work expected to start in the summer of 2025, this approval ...
29/11/2024

Network Space Developments (NSD) has received planning approval from Manchester City Council for a major redevelopment project at its Welcomb Street site in Openshaw, Manchester. The four-acre site, acquired by NSD in 2022, will be transformed into an extension of the adjacent City Works Business ...
29/11/2024

Work has commenced on a new lighting scheme designed to create brighter streets in Digbeth, close to HS2's Birmingham Curzon Street station. The Birmingham City Council project – funded in part through a £210,140 investment from HS2's Business and Local Economy Fund (BLEF) – will see the ...
29/11/2024

Building work has commenced on 14 new modern one-bedroom apartments at Ludwick Green in Welwyn Garden City. The apartments are being developed as part of Welwyn Hatfield Borough Council's (WHBC) Affordable Housing Programme, and its commitment to building new social and affordable homes. Ludwick ...
29/11/2024

River Capital has invested £500,000 in Liverpool-based M&E engineering consultancy, Steven A Hunt & Associates Ltd. The funding was structured to facilitate a management buyout (MBO) by the senior management team of Neil Baines, Anne King, Dave Kelly and Dominic Sibbring from founder Steven Hunt, ...
29/11/2024

Henley Restoration and Remedials has been chosen to carry out extensive external and structural repairs on the Grade II-listed Phoenix Mill, the oldest building in the Rutland Mills complex. Originally a grain store, Phoenix Mill later became a corn mill in the 19th century before transitioning ...
29/11/2024

Dorset County Council's North East Technology Park (NETPark) has been allocated over £11 million towards its expansion. The North East Combined Authority's Cabinet has approved £11.3m of funding for the Sedgefield site from its £160m flagship North East Investment Zone (NEIZ), which aims to drive ...
29/11/2024

Laing O'Rourke, in collaboration with Barnsley College and T3 Training & Development, have opened the UK's first dedicated modern methods of construction (MMC) training facility. The first of its kind training centre represents a groundbreaking step in addressing the UK's construction skills ...
29/11/2024

Aqua Direct are keen to share their support for the Urgent Funding campaign from St Giles Hospice. With a national hospice funding crisis, they need your support more than ever ...
29/11/2024

As we approach the end of 2024, we have been reflecting on what an action-packed year it has been. We have worked with some fantastic clients and sites across the country. We started from our base in Essex over ten years ago, and the demand for trackway has certainly been at its highest ...
Think Construction Skills Ltd.Efco UK LtdT & D Glazing And Installation LimitedBRICOFLOR UKStuart CanvasLakeside HireAqua Direct LtdFoxtons Frames LtdGlass Block Installations LtdWelfare Unit Hire Ltd
Terms and Conditions
2024/11/29 21:21:55