Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
13/09/2021

Plans Submitted For Mixed-Use Development In Wembley

Construction News Image
Regal London has submitted plans for a mixed-use development on Fulton Road in Wembley.

The proposed scheme comprises 759 new homes across three distinct buildings together with more than 30,000 sq ft of flexible commercial space which is set to include retail, light industrial and leisure uses.

Regal London's plans will deliver a highly sustainable mixed-use development in line with the wider aspirations for the Wembley Growth Area in which the site is located.

The plot sits on the East side of Wembley Stadium, a key area which has yet to fully benefit from regeneration. The area's changing context means the proposed scheme would convert an underutilised plot to meet new local needs, including the provision of hundreds of thoughtfully designed new homes, more than a third of which will be affordable. This equates to 35% affordable housing measured by habitable room.

-- Advertisement --
hss

The high-quality contemporary commercial space has been designed to ensure maximum flexibility and to accommodate a range of operators. The space will incorporate a retail element as well as new employment floorspace that will be offered to a variety of prospective tenants, with flexibility as to the sizes of units. Regal London expects this will support up to 230 full time equivalent (FTE) jobs during the operational phase whilst 925 jobs will be created during the construction phase.

Regal London anticipates a start on site date in July 2022 with first occupation in the last quarter of 2025 and full practical completion at the beginning of 2027.

The architects and masterplanners for the scheme are JTP. The award-winning international placemaking practice has previously collaborated with Regal London to bring forward innovative and sustainable developments to sites across London.

New publicly accessible open space has been designed in collaboration with Bradley Murphy Design. Alongside the provision of podium and rooftop gardens for residents, over 40,000 sq ft of public realm is proposed at ground floor level around the buildings. The site will facilitate the delivery of a new west to east route from Fulton Road to Fourth Way, with enhancements to the environment alongside the Wealdstone Brook. Overall, the scheme provides an urban greening factor score of 0.47 and a large biodiversity net gain, reinforcing Regal London's sustainability commitments.

Latest Construction News

29/11/2024

Helmsley Group secured planning permission for the final part of its Coney Street Riverside masterplan which will bring much needed residential space to the city and realise a 50-year ambition to reconnect York to its riverfront. With work expected to start in the summer of 2025, this approval ...
29/11/2024

Network Space Developments (NSD) has received planning approval from Manchester City Council for a major redevelopment project at its Welcomb Street site in Openshaw, Manchester. The four-acre site, acquired by NSD in 2022, will be transformed into an extension of the adjacent City Works Business ...
29/11/2024

Work has commenced on a new lighting scheme designed to create brighter streets in Digbeth, close to HS2's Birmingham Curzon Street station. The Birmingham City Council project – funded in part through a £210,140 investment from HS2's Business and Local Economy Fund (BLEF) – will see the ...
29/11/2024

Building work has commenced on 14 new modern one-bedroom apartments at Ludwick Green in Welwyn Garden City. The apartments are being developed as part of Welwyn Hatfield Borough Council's (WHBC) Affordable Housing Programme, and its commitment to building new social and affordable homes. Ludwick ...
29/11/2024

River Capital has invested £500,000 in Liverpool-based M&E engineering consultancy, Steven A Hunt & Associates Ltd. The funding was structured to facilitate a management buyout (MBO) by the senior management team of Neil Baines, Anne King, Dave Kelly and Dominic Sibbring from founder Steven Hunt, ...
29/11/2024

Henley Restoration and Remedials has been chosen to carry out extensive external and structural repairs on the Grade II-listed Phoenix Mill, the oldest building in the Rutland Mills complex. Originally a grain store, Phoenix Mill later became a corn mill in the 19th century before transitioning ...
29/11/2024

Dorset County Council's North East Technology Park (NETPark) has been allocated over £11 million towards its expansion. The North East Combined Authority's Cabinet has approved £11.3m of funding for the Sedgefield site from its £160m flagship North East Investment Zone (NEIZ), which aims to drive ...
29/11/2024

Laing O'Rourke, in collaboration with Barnsley College and T3 Training & Development, have opened the UK's first dedicated modern methods of construction (MMC) training facility. The first of its kind training centre represents a groundbreaking step in addressing the UK's construction skills ...
29/11/2024

Aqua Direct are keen to share their support for the Urgent Funding campaign from St Giles Hospice. With a national hospice funding crisis, they need your support more than ever ...
29/11/2024

As we approach the end of 2024, we have been reflecting on what an action-packed year it has been. We have worked with some fantastic clients and sites across the country. We started from our base in Essex over ten years ago, and the demand for trackway has certainly been at its highest ...
Efco UK LtdLakeside HireBRICOFLOR UKStuart CanvasThink Construction Skills Ltd.Aqua Direct LtdT & D Glazing And Installation LimitedMy Thread Curtains(London) Builder Cambridge LtdMaccaferri Ltd
Terms and Conditions
2024/11/29 21:19:13