Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
28/02/2022

Work Complete On A30 Crooked Billet Roundabout

Construction News Image
National Highways has announced that work has been completed on the £6.4 million upgrade to the A30 Crooked Billet roundabout near Staines-upon-Thames.

The transformation has made the junction safer and easier for drivers, making the layout more intuitive and reducing the need to change lanes. Pedestrians and cyclists will benefit too, with more than 700 metres of new lanes.

Matt Feather, National Highways A30 Crooked Billet Junction Project Manager, said: "This upgrade has made a real difference at the A30 Crooked Billet junction, making it safer for pedestrians and cyclists and making journeys better for the drivers who use it.

"Over 20,000 vehicles use the junction every day at peak times. Our improvements will increase traffic capacity and cut the risk of accidents, which will improve people’s journeys and boost the economy."

-- Advertisement --
hss

Improvements and renovation works included:

• Upgraded traffic signals and new signs to reflect the new road layout. Introduction of a new signal control system which improves the operation and efficiency of the junction.

• Improved street lighting by replacing the existing high-pressure sodium lamps with more efficient LED lamps. In addition to being low energy they also reduce light pollution.

• A new surface-level route across the roundabout with new crossings for pedestrians and cyclists has been introduced. This provides a safer and more direct link for both pedestrians and cyclists.

• Upgraded pedestrian and cycle routes which improves access between Staines-upon-Thames, Hounslow and Heathrow Airport (delivered in partnership with Surrey Council) to make it easier for people to get around the area on foot, by bicycle and public transport.

• Overall 700 metres+ of new lanes for safety of pedestrians and cyclists.

• The east and westbound carriageway markings have been realigned. The previous four narrow lanes have been made in to three wider lanes through the centre of the roundabout in both directions. This change removes the underused fourth lane while matching the three existing lanes on the approaches to the junction, to reduce unnecessary lane changing.

• The eastbound carriageway approach has been widened for a short section where the road bends left to enter the roundabout. This provides two dedicated lanes which were previously of sub-standard width.

• Updated and renovated drainage system.

Latest Construction News

29/11/2024

Helmsley Group secured planning permission for the final part of its Coney Street Riverside masterplan which will bring much needed residential space to the city and realise a 50-year ambition to reconnect York to its riverfront. With work expected to start in the summer of 2025, this approval ...
29/11/2024

Network Space Developments (NSD) has received planning approval from Manchester City Council for a major redevelopment project at its Welcomb Street site in Openshaw, Manchester. The four-acre site, acquired by NSD in 2022, will be transformed into an extension of the adjacent City Works Business ...
29/11/2024

Work has commenced on a new lighting scheme designed to create brighter streets in Digbeth, close to HS2's Birmingham Curzon Street station. The Birmingham City Council project – funded in part through a £210,140 investment from HS2's Business and Local Economy Fund (BLEF) – will see the ...
29/11/2024

Building work has commenced on 14 new modern one-bedroom apartments at Ludwick Green in Welwyn Garden City. The apartments are being developed as part of Welwyn Hatfield Borough Council's (WHBC) Affordable Housing Programme, and its commitment to building new social and affordable homes. Ludwick ...
29/11/2024

River Capital has invested £500,000 in Liverpool-based M&E engineering consultancy, Steven A Hunt & Associates Ltd. The funding was structured to facilitate a management buyout (MBO) by the senior management team of Neil Baines, Anne King, Dave Kelly and Dominic Sibbring from founder Steven Hunt, ...
29/11/2024

Henley Restoration and Remedials has been chosen to carry out extensive external and structural repairs on the Grade II-listed Phoenix Mill, the oldest building in the Rutland Mills complex. Originally a grain store, Phoenix Mill later became a corn mill in the 19th century before transitioning ...
29/11/2024

Dorset County Council's North East Technology Park (NETPark) has been allocated over £11 million towards its expansion. The North East Combined Authority's Cabinet has approved £11.3m of funding for the Sedgefield site from its £160m flagship North East Investment Zone (NEIZ), which aims to drive ...
29/11/2024

Laing O'Rourke, in collaboration with Barnsley College and T3 Training & Development, have opened the UK's first dedicated modern methods of construction (MMC) training facility. The first of its kind training centre represents a groundbreaking step in addressing the UK's construction skills ...
29/11/2024

Aqua Direct are keen to share their support for the Urgent Funding campaign from St Giles Hospice. With a national hospice funding crisis, they need your support more than ever ...
29/11/2024

As we approach the end of 2024, we have been reflecting on what an action-packed year it has been. We have worked with some fantastic clients and sites across the country. We started from our base in Essex over ten years ago, and the demand for trackway has certainly been at its highest ...
Think Construction Skills Ltd.T & D Glazing And Installation LimitedEfco UK LtdStuart CanvasLakeside HireBRICOFLOR UKAqua Direct LtdArboles UKBritannic Trade Frames LTDABC Service
Terms and Conditions
2024/11/29 21:23:14