Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Architectural Design Sponsored Companies
  • PLANNING APPLICATION
  • BUILDING REGULATIONS
  • CHANGE OF USE
  • GROUND FLOOR SIDE EXTENSION
  • HMO
  • NEW BUILD HOUSE
  • RESIDENTIAL EXTENSION
  • TWO STOREY SIDE EXTENSION
  • TWO STOREY REAR EXTENSION

T: +44 7438294487 | E: info@facadesign.co.uk
  • Planning Drawings and Applications
  • Planning Appeals
  • Building Regulations
  • Drawings and Applications
  • Interior Design (Kitchens and Bathrooms)
  • Site Supervision
  • Project Management
  • Computer Aided Design service
  • PLANNING APPLICATION
  • BUILDING REGULATIONS
  • CHANGE OF USE
  • GROUND FLOOR SIDE EXTENSION
  • HMO
  • NEW BUILD HOUSE
  • RESIDENTIAL EXTENSION
  • TWO STOREY SIDE EXTENSION
  • TWO STOREY REAR EXTENSION

T: +44 7438294487 | E: info@facadesign.co.uk

Architectural Design in East Midlands

View : View Selfbuilders  Map  List Regions
Placeholder
Lucy Ward Architect
The Old School, Elm Road, Folksworth, Peterborough, PE7 3SX
Placeholder
Mdesign London
17 Manchester Street, London, W1K4QN
Placeholder
Mgb Associates
84/Albert Hall Mansions, Kensington Gore, London, SW7 2AQ
Placeholder
PD Architecture
30 Main Street, Lambley, Lambley, Nottingham, NG4 4PN
Placeholder
Pentangle Design Group
Suite 1, 21 Bancroft, Hitchin, SG5 1JW
Placeholder
Plan It Design
Richmond House, Long Bennington, NG23 5JR
Placeholder
SHSC Handrails Limited
Unit 12 Oban Court, Hurricane Way, Wickford, SS11 8YB
Placeholder
The Practical Planning Company
18 Bridge Street, Sandiacre, NG10 5QT
Placeholder
Thistle Steel Buildings
11A Drakemyre, Beith, Dalry, KA24 5JD
Placeholder
Woodwood (Group) Ltd
Unit 8, Rosewood Business Park, Easyways, Witham, CM8 3AA
Placeholder
Ziggurat Design
2 Lime Close, Caversfield, Oxon, NN14 1NN
Page 3 of 3 (71 results)
Jump to page
Misura LtdAtrium Planning ConsultantsAdam Fahey DesignModern GardenSmiths Concrete LtdDinstockCompass Protection Manufacturing LimitedAqua Direct LtdAcuity ComplianceThe Bifolding Door Factory
Terms and Conditions
2024/11/30 01:52:45