The McAvoy Group has been appointed to deliver a new wing at Northumbria Specialist Emergency Care Hospital in Cramlington.
The firm has secured a £15m contract for the offsite construction of the wing.
Linked to the existing hospital, the three-storey building will feature a first floor to accommodate one of the UK's first purpose-designed Ambulatory Care units. The other two floors will be fitted out in the next phase of the development.
The dedicated, 2000m2 facility for ambulatory care will provide services in medicine, surgery, gynaecology and orthopaedics. Facilities include waiting areas; interview, assessment, and treatment rooms; plaster room with mobile x-ray; trolley bays; patient lounges; ultrasound; single ensuite rooms; nurse's station; staff rest room; clinical stores; utility rooms, and an open-plan office.
Robert Sanderson, Deputy Director of Capital Projects at Northumbria Healthcare FML said: "With this new development, the Trust is demonstrating a dynamic approach with its use of modern methods of construction. The quality of the facility to meet the clinical requirements is our main driver for a McAvoy offsite solution. We will also benefit from a huge reduction in the build programme – from at least two years to just 12 months. This will bring enormous benefits for reducing waiting times in A&E next year and the new ambulatory care unit will enable us to assess, treat and discharge patients more quickly."
Raymond Millar, Construction Director of The McAvoy Group, added: "We are again pushing the boundaries of offsite construction. This is a highly complex project on a live hospital site. We are integrating with the design of the existing hospital and using offsite construction to deliver the building to a very short programme, achieve exceptional value for money and to the Trust's stringent quality standards. We have developed a hybrid solution which incorporates both offsite and in-situ building methods and are maximising fit-out in the factory for this first phase to enhance quality and reduce disruption to staff and patients."
The project will involve using larger, bespoke modules up to 14.85m long which have been specially engineered to provide a structural flooring solution that seamlessly integrates with the existing hospital building. Mechanical ventilation, heating and cooling systems will also be installed in the ceiling voids in the McAvoy factory, a industry first in the healthcare sector.
Designed by healthcare specialists P+HS Architects working with McAvoy as principal contractor, the new wing will replicate the appearance of the existing hospital which opened in 2015. It will have a faceted external facade to create curved ends to the wing and will be finished in blue and white render. This hybrid construction solution has a three-storey offsite structure with an in-situ built curved link on each floor, a roof-top plant room and full-height stair towers.
The new wing is due for completion in Spring 2019.
(CM)
Time and date
CONSTRUCTION DIRECTORY
Latest Construction News
15/11/2024
A significant redevelopment is underway at Royal Naval Air Station (RNAS) Culdrose, Cornwall, following a contract award to Kier and Mott MacDonald. The Defence Infrastructure Organisation (DIO) and the Royal Navy marked the occasion with a contract-signing and ground-breaking ceremony, ...
15/11/2024
JV North, a consortium of housing associations and local authorities, has unveiled a new £500 million procurement framework aimed at delivering over 3,000 affordable homes between 2025 and 2029. The initiative marks a significant boost for social housing and the construction sector. The ...
15/11/2024
Sempra Homes has announced funding approval for a new affordable housing project at Bowers Close on London Road, Pitsea. The development will deliver 31 high-quality homes, offering a mix of rental and shared ownership properties designed to address local housing needs. The project has received ...
15/11/2024
Vistry Group has received planning permission for the first phase of its Wolborough Grange development, which will deliver 94 high-quality homes. This milestone marks the beginning of a transformative project that will provide sustainable housing and significant community benefits in Newton ...
15/11/2024
Salisbury Coach Park and the main footpaths through the Central Car Park have reopened following an extensive transformation by the Environment Agency as part of the River Park scheme. The upgraded facilities aim to provide a more welcoming and comfortable experience for coach passengers visiting ...
15/11/2024
Pennyfarthing Homes has unveiled an exceptional collection of one- and two-bedroom apartments at Oakwood Grove, a modern development offering affordable homes through the Government-backed First Homes scheme, now available via Dorset Council. Located in the scenic rural village of Alderholt, ...
15/11/2024
Morris & Spottiswood Group has acquired part of the collapsed ISG group, offering a vital lifeline to the employees and projects operating within its remit. Absorbing the former ISG Cathedral business, Morris & Spottiswood Group, which is a specialist provider of fitout, refurbishment, M&E, ...
15/11/2024
Morgan Sindall Construction has officially commenced work on Rosherville Church of England Academy, a new primary school designed to address the educational needs of Northfleet’s expanding community. To commemorate the start of the project, a time capsule was ceremonially lowered into the ground, ...
15/11/2024
Vistry Group has exchanged contracts to develop over 200 mixed-tenure homes at Waggons Way, Doncaster. The 16-acre site, formerly part of the Hatfield Colliery, will be transformed into a vibrant new community featuring up to 236 high-quality homes. The proposed development will include homes ...
15/11/2024
The University of Sunderland has officially relaunched its newly refurbished cinema. The venue on St. Peter's Campus was damaged beyond use due to Storm Arwen in 2021, but now a £1.3m investment means it is back in action once again. To mark the occasion, Sir David Bell, the University’s ...