McLaren Construction has been chosen by Publica Properties Establishment to carry out the £132 million refurbishment and extension of 318 Oxford Street, repurposing the House of Fraser department store as a 34,000 square metre mixed-use development.
The project restores the art deco landmark, built in 1937 and occupied originally by DH Evans and then by the House of Fraser until it went into administration in August 2018. The building is badly damaged by 'Regent Street disease' and McLaren will be responsible for repairing the Portland stone façade, reinstating architectural features, and completing the Chapel Place façade.
Reuse of a large proportion of the façade and structure significantly reduces the new building’s whole-life embodied carbon, while the installation of high-performance windows and centralised building services will reduce operational carbon emissions.
The structural design relocates 10 steel columns retrieved from the demolished 5th floor to the new 8th floor. The remaining 11 columns from the fifth floor have been transported across London to be re-used within another project by the same structural engineer working with a third-party contractor.
The project's development manager, Joseph McNeil, commented on behalf of Publica Properties Establishment, “The project has been a fantastic opportunity to work with McLaren Construction on a truly ‘retro-first’ approach, bringing this building back to life with the minimum whole-life embodied carbon impact.”
McLaren Construction's London and South Managing Director, Darren Gill, commented: "More of these asset repurposing projects are coming through to the market. These are often familiar buildings in prominent locations. They present an opportunity to improve resilience through a variety of new uses – not just for the building, but for the area too.
"The construction industry will increasingly need the skills to repurpose historic buildings. It's essential if we want to balance the creation of quality spaces with reduced carbon footprints. McLaren’s investment in this expertise is paying off with a raft of high profile cut and carve projects in central London."
The new building replaces a department store with ground-floor retail, including two new double-height entrances, and high-quality office space, plus two restaurants and a gym with a swimming pool. This resilient mix of uses is intended to bring greater diversity to Oxford Street and helps to develop an evening economy.
The 6th and 7th floors, originally designed with low ceilings for back-of-house uses, will be reconstructed, with the addition of a new terrace. A new set-back 8th-floor extension in lightweight construction is intended as a top-floor restaurant and has a terrace.
The internal area of the north-western and south-western corners of the building will be demolished and reconstructed to remove staircases, lift shafts and internal divisions, creating larger and more flexible floorplates.
Public realm improvements include wider footpaths with new paving to indicate the new layout and entrance points into the building. Decorative paving will feature along Chapel Place.
The building has deteriorated due to 'Regent Street disease’' a condition affecting early 20th Century buildings with steel structures clad in masonry. Corrosion of the steel structure has cracked and displaced parts of the stone façade. The existing windows have decayed and rusting frames, contributing to damage. The façade has been covered in safety netting since 2020.
The project is McLaren's latest contribution to the reinvention of Oxford Street, as landowners bring a greater mix of uses to the street and where the company is currently refurbishing the flagship Oxford Circus store at 214 Oxford Street. Past projects include 58-60 Berners Street, combining four buildings to create a 7,000 sq m development, the redevelopment of the former Virgin/Zavvi store to create a 13,100 sq m mixed-use development and an eight-storey building between 11-12 Hanover Square and Oxford Street offering 4,500 sq m of office accommodation and 1,400 sq m of retail space.
Time and date
CONSTRUCTION DIRECTORY
Latest Construction News
15/11/2024
A significant redevelopment is underway at Royal Naval Air Station (RNAS) Culdrose, Cornwall, following a contract award to Kier and Mott MacDonald. The Defence Infrastructure Organisation (DIO) and the Royal Navy marked the occasion with a contract-signing and ground-breaking ceremony, ...
15/11/2024
JV North, a consortium of housing associations and local authorities, has unveiled a new £500 million procurement framework aimed at delivering over 3,000 affordable homes between 2025 and 2029. The initiative marks a significant boost for social housing and the construction sector. The ...
15/11/2024
Sempra Homes has announced funding approval for a new affordable housing project at Bowers Close on London Road, Pitsea. The development will deliver 31 high-quality homes, offering a mix of rental and shared ownership properties designed to address local housing needs. The project has received ...
15/11/2024
Vistry Group has received planning permission for the first phase of its Wolborough Grange development, which will deliver 94 high-quality homes. This milestone marks the beginning of a transformative project that will provide sustainable housing and significant community benefits in Newton ...
15/11/2024
Salisbury Coach Park and the main footpaths through the Central Car Park have reopened following an extensive transformation by the Environment Agency as part of the River Park scheme. The upgraded facilities aim to provide a more welcoming and comfortable experience for coach passengers visiting ...
15/11/2024
Pennyfarthing Homes has unveiled an exceptional collection of one- and two-bedroom apartments at Oakwood Grove, a modern development offering affordable homes through the Government-backed First Homes scheme, now available via Dorset Council. Located in the scenic rural village of Alderholt, ...
15/11/2024
Morris & Spottiswood Group has acquired part of the collapsed ISG group, offering a vital lifeline to the employees and projects operating within its remit. Absorbing the former ISG Cathedral business, Morris & Spottiswood Group, which is a specialist provider of fitout, refurbishment, M&E, ...
15/11/2024
Morgan Sindall Construction has officially commenced work on Rosherville Church of England Academy, a new primary school designed to address the educational needs of Northfleet’s expanding community. To commemorate the start of the project, a time capsule was ceremonially lowered into the ground, ...
15/11/2024
Vistry Group has exchanged contracts to develop over 200 mixed-tenure homes at Waggons Way, Doncaster. The 16-acre site, formerly part of the Hatfield Colliery, will be transformed into a vibrant new community featuring up to 236 high-quality homes. The proposed development will include homes ...
15/11/2024
The University of Sunderland has officially relaunched its newly refurbished cinema. The venue on St. Peter's Campus was damaged beyond use due to Storm Arwen in 2021, but now a £1.3m investment means it is back in action once again. To mark the occasion, Sir David Bell, the University’s ...