Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
27/06/2008

Premium Construction System Delivers Top Results

Construction News Image
Despite current construction market conditions our dynamic industry environment must come to terms with further changes over the coming months. As of the 1 July 2008 the new Part L of the building regulations comes in to force for all new planning applications.

These regulations aim to reduce the impact of the built environment on our natural environment thus bringing new challenges to contractors and developers.

A key implication of the New Part L (under the transitional arrangements) is the fact that buildings that have been awarded planning on or before the 30 June 2008 and substantial work has been completed by the 1 July 2009 will also be subject to regulations by default. This poses a key question for developers and contractors alike, "how are we to meet the requirements of Part L for these semi-completed buildings?"

The solution is simple: seek an industry leading, high performance, economical system to facilitate in meeting the requirements of Part L.

'Fusion Therma Shield 162' is a core component of the Fusion light gauge steel frame building system.

-- Advertisement --
hss

The 'Fusion Therma Shield 162' insulated external wall panel system was modified in August 2007 in anticipation of the requirements of Part L. The key technical and performance aspects of this innovative, 162mm thick, factory insulated wall panel combine to deliver premium results under Part L.

Fusion's independently accredited Thermal Bridging details comply with Part L regulations and with optional bespoke design it is possible to achieve significantly lower Psi values.

The elemental wall U-value of 'Fusion Therma Shield 162' is 0.21W/m2K with a traditional masonry outer leaf, thus exceeding Part L requirements. Wall U-values as low as 0.12 W/m2K with the addition of complementary insulation products.

'Fusion Therma Shield 162' requires no counter battens are to make services airtight within the external walls due to the unique properties of the panel. This results in significant cost savings on labour, material and internal floor space when compared to other construction methods.

'Fusion Therma Shield 162' provides the perfect platform for external walls to achieve an A-rated standard with no extra expenditure. 'Fusion Therma Shield 162' insulated external wall panels mean superior thermal performance and increased energy efficiency of structures. This results in reduced operational heating costs, a shorter heat up period and the potential to downsize boilers and radiators. Fusion structures are robust and highly energy efficient.

Overall, a Fusion structure will assist in decreasing energy bills and CO2 emissions, thus reducing the occupier's personal carbon footprint. The excellent energy performance ratings that are facilitated by 'Fusion Therma Shield 162' ensure that all Fusion buildings also have excellent resale potential. The panelised nature of the Fusion light gauge steel frame system also makes structures suitable for modification as the needs of occupiers change.

Latest Construction News

15/11/2024

A significant redevelopment is underway at Royal Naval Air Station (RNAS) Culdrose, Cornwall, following a contract award to Kier and Mott MacDonald. The Defence Infrastructure Organisation (DIO) and the Royal Navy marked the occasion with a contract-signing and ground-breaking ceremony, ...
15/11/2024

JV North, a consortium of housing associations and local authorities, has unveiled a new £500 million procurement framework aimed at delivering over 3,000 affordable homes between 2025 and 2029. The initiative marks a significant boost for social housing and the construction sector. The ...
15/11/2024

Sempra Homes has announced funding approval for a new affordable housing project at Bowers Close on London Road, Pitsea. The development will deliver 31 high-quality homes, offering a mix of rental and shared ownership properties designed to address local housing needs. The project has received ...
15/11/2024

Vistry Group has received planning permission for the first phase of its Wolborough Grange development, which will deliver 94 high-quality homes. This milestone marks the beginning of a transformative project that will provide sustainable housing and significant community benefits in Newton ...
15/11/2024

Salisbury Coach Park and the main footpaths through the Central Car Park have reopened following an extensive transformation by the Environment Agency as part of the River Park scheme. The upgraded facilities aim to provide a more welcoming and comfortable experience for coach passengers visiting ...
15/11/2024

Pennyfarthing Homes has unveiled an exceptional collection of one- and two-bedroom apartments at Oakwood Grove, a modern development offering affordable homes through the Government-backed First Homes scheme, now available via Dorset Council. Located in the scenic rural village of Alderholt, ...
15/11/2024

Morris & Spottiswood Group has acquired part of the collapsed ISG group, offering a vital lifeline to the employees and projects operating within its remit. Absorbing the former ISG Cathedral business, Morris & Spottiswood Group, which is a specialist provider of fitout, refurbishment, M&E, ...
15/11/2024

Morgan Sindall Construction has officially commenced work on Rosherville Church of England Academy, a new primary school designed to address the educational needs of Northfleet’s expanding community. To commemorate the start of the project, a time capsule was ceremonially lowered into the ground, ...
15/11/2024

Vistry Group has exchanged contracts to develop over 200 mixed-tenure homes at Waggons Way, Doncaster. The 16-acre site, formerly part of the Hatfield Colliery, will be transformed into a vibrant new community featuring up to 236 high-quality homes. The proposed development will include homes ...
15/11/2024

The University of Sunderland has officially relaunched its newly refurbished cinema. The venue on St. Peter's Campus was damaged beyond use due to Storm Arwen in 2021, but now a £1.3m investment means it is back in action once again. To mark the occasion, Sir David Bell, the University’s ...
BRICOFLOR UKStuart CanvasLakeside HireThink Construction Skills Ltd.Aqua Direct LtdEfco UK LtdT & D Glazing And Installation LimitedAirconcoolContinox.ltdKladworx
Terms and Conditions
2024/11/16 05:36:11